Harvard State Bank

Harvard-State-BankThe new 7,950 square foot, one-story facility for Harvard State Bank in Oregon, Illinois is being built on a site that previously consisted of five residential sites that were rezoned as commercial.

The building includes an entry tower and curved street-facing facade with a design to match the local architectural flavor. The building materials on the exterior include a split-face block base with brick and Exterior Insulation and Finishing System (EIFS) above. The facility includes a lower level, as well as three drive-up lanes plus an ATM unit in the outboard lane.

The project will be breaking ground in July 2016 and is estimated to be completed in late Winter 2017.

The Redmond Company