Archive

Construction on this location began in mid-fall, with the necessity to complete site construction before the first snowfall. A major challenge in the development of this project was remaining on schedule while processing contaminated soils. With proper scheduling and great teamwork, the building went up...

The Redmond Company is pleased to have completed one of the first Gordon Food Service Marketplace stores in Wisconsin. Construction of this new store was performed over the winter months. Mother Nature caused a months worth of lost work days.   Despite a tight time frame and...

The site was originally a landfill. Due to contaminated soils, the entire foundation and interior slab was built on 170 geo piers. There was also a methane gas dispersing system which included a rubber membrane, underground duct work, and a spray sealant over the interior...

The Redmond Company utilized unique scheduling and construction techniques to demolish an existing grocery store and built the new Pick 'n Save - Oak Creek, Wisconsin, on the site in less than four months.   One of the client’s main criteria was the minimization of downtime during...

Located on a highly visible site in Crystal Lake, Illinois, this project presented The Redmond Company with considerable site and safety challenges. The project included a tremendous amount of site work and site improvements. Redmond worked closely with the Illinois Department of Transportation (IDOT) on...

The owners at Trig's Shopping Center chose The Redmond Company to undertake an exterior ‘facelift’ renovation for the shopping center in Minocqua, Wisconsin. Redmond designers created an attractive look that blended well with the City of Minocqua's current architectural features.   The challenges with this type of remodel were...

The Redmond Company is proud that this Walgreens won a Mayor’s Urban Design Award. This award is given to buildings with unique and innovative designs that complement the diversity of Milwaukee’s neighborhoods and enhance the City’s image. The 14,560 square-foot 27th Street location won in...

This Walgreens location was the anchor of a live remodel of a strip mall. All the tenants required a new storm sewer, site lighting, and an asphalt parking lot. The Walgreens space was connected to strip mall with shared structural walls needing to be built...

The Aquatic Center is located at a children’s camp on Lac La Belle. It includes a lap pool and an activities pool, heated by solar panels, and two free-standing water slides. The pool house integrates solar tube skylights over indoor showers, changing rooms and bathrooms....

The building for NAPA Auto Parts in Hales Corners, Wisconsin was designed with non-typical details for the area. Through massive cooperation of the subcontractors and with careful coordination by The Redmond Company, the shell of the building was constructed. One challenge for the Redmond team...